Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 2800

Re: Inspection lot getting created in Planning Plant

$
0
0

Hi Amit,

 

I think you can try below setup:

 

1. You can extend the MIC's form Plant A to the inspection plan, linked to the inspection lot.

2. Extend material's QM View in Plant B with inspection type 04

3. Receive GR form process order in Plant B. An inspection lot will be created in Plant B.

4. Perform RR + UD. After UD, the unrestricted stock should be posted to Plant B, good storage location.

5. Perform material movement transfer posting Plant to Plant, one step MB1B/MvT 301. Please check the link: 301 movement type.... | SCN

 

If there is any better response to fix your business case, please go ahead with that.

 

Thanks,

Arijit

 

Message was edited by: Arijit Banerjee


Viewing all articles
Browse latest Browse all 2800

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>