Hi Amit,
I think you can try below setup:
1. You can extend the MIC's form Plant A to the inspection plan, linked to the inspection lot.
2. Extend material's QM View in Plant B with inspection type 04
3. Receive GR form process order in Plant B. An inspection lot will be created in Plant B.
4. Perform RR + UD. After UD, the unrestricted stock should be posted to Plant B, good storage location.
5. Perform material movement transfer posting Plant to Plant, one step MB1B/MvT 301. Please check the link: 301 movement type.... | SCN
If there is any better response to fix your business case, please go ahead with that.
Thanks,
Arijit
Message was edited by: Arijit Banerjee