Re: Removed Factory Calendar from Plant

$
0
0

Hello,

 

If i removed the Factory calendar from Plant, After this when we create a PO for Material or without material then system ask us to enter delivery date, if suppose we entered the delivery date system should show us an error, because we didn't have any factory calendar assignment to plant.

 

We will set Plant specific Mat status in Material through MM17, but user can create PO without material also.

 

Why system not stopping us to create PO when we removed factory calendar from plant.  expected is whereever we get delivery date field we will get an error, For ex: we have delivery date field in PO, Here we will stop

In GR we have delivery date field, here also we can stop,  like this planned without development is this possible, I tried to create PO without Factory calendar in Plant, system allows me to create PO. checked Message 00 ME 77 and 89 also, no use,

 

1) We can stop through Plant Material status in Material, but user can create PO without material also

2) We can stop through M_BEST_WRK /M_BANF_WRK, to create PO, when if user user plant in Inventory Management to load the stock for Material.?

 

thanks